The District has established various programs to manage their assets, they include:

The image shows a white vacuum truck, likely used for waste management or cleaning purposes, parked in a yard.
  • Preventive Sewer Line Maintenance: Mainline sewers are inspected and cleaned on an annual basis to prevent stoppages and sanitary sewer overflows.
  • Lateral Corrective Maintenance: The District policy is to maintain your sewer lateral in the public right-of-way if your residence or business has an approved cleanout located at the property line. If you experience a problem, contact the District. A crew will be dispatched, and if it is a District responsibility, we will take corrective action to remedy the problem.
  • Inspection Service: All new sewer line installations and repairs are required to meet the District's Standard Specifications. A field inspection by the District Inspector is required during installation. Prior to acceptance by the District, a video inspection of the line is performed.
  • Sewer System Evaluation: Testing methods such as television inspection, flow monitoring, smoke testing and other methods, allow the District Engineer to analyze the data to develop a master plan. The District utilizes this data to correct deficiencies within the sewer system before they create a serious problem, as well as for planning for future needs and capital improvement projects.
  • Capital Improvement Projects: Beginning in 1985, the District implemented an extensive program to replace old, broken and undersized sewer lines. Since 1985, the District has installed new or rehabilitated sewer lines in about sixty five percent of the District. We have updated the Master Plan and are planning more sewer replacement including residential laterals from the cleanout to the mainline sewer. The District has also made significant upgrades to the CPS.  The effluent flow meter and pump station valves have been replaced, and the standby generator which is 45 years old is scheduled for replacement in 2017.  These projects have been funded on a pay-as-you-go basis and future projects will be funded in the same manner.
  • Preventive Pump Station Maintenance: Carlyle Pump Station located at 36 Industrial Way in Brisbane, was built in 1972. The majority of the District's wastewater flows into this station and is pumped to the City & County of San Francisco's southeast treatment plant where it receives secondary treatment. The District Board has set an aggressive maintenance policy for the station. The station is inspected on a daily basis for proper operation and scheduled maintenance is performed. This approach has resulted in the station operating at full efficiency.